 |
INFRASTRUCTURE |
|
 |
The zone is equipped with infrastructure facilities at international
standard, including:
-
Power supply: The
priority power supply will be guaranteed by the power company
to the zone from the national power grid.
-
Water supply: The
water supply is from Ho Chi Minh City Water Plant and from the
underground water source that meets the standard of TC505/BYT
-
Telephone: Sufficient
IDD telephone lines are available for investors.
-
Waste water treatment plant:
The controlled discharge waste water from EPZ and IP enterprises
will be treated by the Waste Water Treatment Plant to meet the
standard of TCVN5945-1995 before it is discharged into the city's
sewage system.
-
Road: The internal
road system with asphalt-concrete pavement is designed in accordance
with the standard VN H30.
|
 |
 |
TOPOGRAPHIC AND GEOLOGICAL |
|
 |
CHARACTERISTICS
The soil in Linh Trung is 19 - 30 meters above the sea level
with the bearing capacity of 2 kg/cm2 and the natural slope of
0 - 3%.
CLIMATE
The South Vietnam with monsoon tropical climate has two main
seasons: the rainy and the dry. Average temperature is 21-30°C,
average humidity 80%, and average annual rainfall 1997 mm
|
 |